BEC complete major overhaul of Keele University’s Walter Moberly building BeMS

Walter Moberly BACnet BeMS

BEC are proud to have worked with George Birchall Ltd & Walmsley Associates to complete a major overhaul of the Walter Moberly HVAC systems.

The project consisted of BACnet integration to the Mitsubishi VRF Air Conditioning and heat recovery systems, control of the Boiler plant and hot water system control and reporting.

BEC used Delta Control's enteliZONE Networks Sensors (eZNS) to provide the room occupancts with temperature, CO2 and motion detection to allow efficient control of the room and give a user friendly, colour changing (based on room conditions) touch sensitive display.

WM GF

Leave A Reply

Your email address will not be published. Required fields are marked *